Books:
"A Noncomputer Approach to the Critical Path Method for the
Construction Industry", Fondahl, Stanford, 1962
"Applied Principles of Project Planning and Control", Waldron, A.
James Waldron, 1968
"Bau-Projeckt Management", Roesch & Volkmann, Rudolf Mueller, 1994
"Construction Delay Claims", Bramble & Callahan, , John Wiley, 2dE
1992
"Construction Documentation", O'Brien, Joshua Wiley, 3dE 1995
"Construction Management: A Professional Approach", Muller, Kavanagh
& O'Brien, McGraw-Hill, 1978
"Construction Planning and Scheduling", Associated General
Contractors, AGC, 1999
"Construction Scheduling with Primavera Project Planner ",
Feigenbaum, Prentice Hall, 1998
"Construction Scheduling: Preparation, Liability and Claims",
Wickwire, Driscoll, and Hurlbut, John Wiley, 1991
"Contractor's Management Handbook", O'Brien & Zilly, McGraw-Hill,
1971, Chapter 7 "Critical Path Method" (Kreitzberg & Radcliffe); 2dE
1991, Chapter 10 "Scheduling," (O'Brien)
"Cost Control and CPM in Construction", White, Glenn L., AGC, 1968;
2dE 1976
"CPM in Construction Management", O'Brien & Plotnick, McGraw-Hill,
5thE 1999
"CPM in Construction Management", O'Brien, 1965; 2dE 1971; 3dE 1984;
4thE 1993
"DOD-NASA PERT-Cost Guide", U.S. Department of Defense,U.S. DOD,
June 1962
"Effective Project Management through Applied Cost and Schedule
Control", Bent & Humphreys, Dekker, 1996
"Finite Capacity Scheduling: Management, Selection and
Implementation", Patrick, Wiley, 2000
"Industrial Engineering Handbook, pp. 7-36, "The Gantt Chart" ",
Maynard (ed), Mrs. Wallace Clark 1963
"Industrial Scheduling", Mirth & Thompson, Prentice Hall, 1963
"Line of Balance Technology", U.S. Navy, Office of Material, U.S.
Navy, 1962
"Management Information Systems", O'Brien, Van Nostrand Reinhold,
1970
"Modification Impact Guide EP415-1-3", US Army Corps of Engineers,
U.S. Army, 1979
"NASA PERT and Companion Cost Guide Handbook", NASA, October, 1962
"NASA PERT and Companion Cost Guide", NASA, 1962
"NASA PERT in Facilities Project Management", NASA, 1965
"Network Analysis Systems", U.S. Army Corps of Engineers,
Regulations ER-1-1-11, U.S. Army, 1963; 2dE 1973; 3dE 1985
"Network Scheduling and Control Systems", Wattel (ed), Hofstra, 1964
"Network-Based Management Systems (PERT/CPM)", Archibald & Villoria,
John Wiley & Sons, 1967
"Networking Techniques for Project Planning, Schedule and Control:
Handbook of Construction Management and Organization", Fondahl,
Stanford, 1973
"Project and Production Scheduling", Fleming, Brown, and Humphreys,
Probus Publishing, 1987
"Project Management with CPM, PERT and Precedence Programming",
Moder & Phillips, 2dE 1983
"Project Management: A Systems Approach to Planning, Scheduling and
Controlling Wiley, 1998", Kerzner, Wiley, 1998
"Project Management: Effective Scheduling", Dreger, Van Nostrand
Reinhold, 1992
"Project Planning, Scheduling & Control," Lewis, McGraw Hill, 1995
"Project Planning, Scheduling and Control in Construction: An
Encyclopedia of Terms and Applications", Popescu, Wiley, 1995
"Project Scheduling and Construction Claims, a Practical Handbook",
Wickwire, Walstad, Asselin, and Kasimer, A. James Waldron
Enterprises, 1975
"Schedule Guide for Program Managers", U.S. Department of Defense,
Defense Systems Management College Press, 1994
"Schedule, Cost and Profit Control with PERT", Miller, McGraw-Hill,
1963
"Scheduling Handbook", O'Brien, McGraw-Hill, 1969, reissued as
"Classic Handbook"
"Standard Handbook of Heavy Construction", O'Brien (ed),
McGraw-Hill, 3dE 1996, Chapter 3 "Construction Planning and
Scheduling," (Caldwell)
"The Critical Path Method", Shafter, Ritter, and Meyer, McGraw-Hill,
1965
"The Gantt Chart", Clark, Ronald, 1922
"The Line of Balance", Lumsden, Permagon Press, Oxford, London, 1968
"The Use of CPM in Construction: A Manual for General Contractors",
White, Glenn L., Associated General Contractors of America, 1965;
2dE 1976
"VA CPM Handbook", Veterans Administration, Veterans Administration,
1989
Articles/Papers:
"Application of a Technique for Research and Development Program
Evaluation", D.G. Malcomb, J. H. Roseboom, C.E., Clark, and W. Fazar,
Operations Research, vol. 7, no. 5, pp. 646-699, 1959
"Bureau of Naval Ordinance PERT Summary Report: Phase I and Phase
II", Special Projects Office, Navy Department, 1958
"CPM for Turnarounds", O'Brien, Berman, and Gleason, Hydrocarbon
Processing and Petroleum Refiner, pp. 133-138, February 1964
"Critical Path Engineering", O'Brien, Midwest Engineer, pp. 6-7,
March 1965
"Critical Path Planning and Scheduling Mathematical Basis", Kelley,
Operations Research, pp. 296-320, May-June 1961
"Critical Path Planning and Scheduling", Kelley and Walker,
Proceedings of the Eastern Joint Computer Conference, 1959
"Fifteen Key Features of Computer Programs for CPM and PERT",
Phillips, Journal of Industrial Engineering, January-February 1964
"Graphical Evaluation and Review Technique", Pritsker and Happ,
Journal of Industrial Engineering, May 1966
"Manpower Leveling of PERT Networks", DeWitte, Data Processing for
Science/Engineering, March-April 1964
"Multi-ship Multi-shop Workload Smoothing Program", Levy, Thompson,
and Wiest, Naval Research Logistics Quarterly, March 1963
"Project Scheduling: The Second Generation", O'Brien, Machine
Design, pp. 172-181 April 1965
"RAMPS: A New Tool in Planning and Control", Lambourn, The Computer
Journal, vol. 5, no. 4., pp. 300-304, January 1963
"RAMPS: Technique for Resource Allocation and Multi-project
Scheduling", Moshmann, Johnson, and Larsen, Proceedings of the Job
Computer Conference, Spring 1963
"Resource Allocation in Project Network Models: A Survey", Davis,
Journal of Industrial Engineering, pp. 177-187, April 1966
"RPSM: A Way to Schedule Equipment and Manpower", O'Brien,
Contractors and Engineers, April 1965
"The Use of Critical Path Method Technologies in Contract Claims",
Wickwire & Smith, 7 Public Contract Law Journal, 1974
"Use of Critical Path Method on Contract Claims - 2000", Wickwire &
Ockman, 19 Construction Lawyer, No. 4, October, 1999
"Use of Critical Path Techniques in Contract Claims Issues and
Developments 1974 to 1988", Wickwire, Hurlbut & Lerman, 18 Public
Contract Law Journal 1989
"Variation in Activity Level on a Cyclic Arrow Diagram", Burgess &
Killebrew, Journal of Industrial Engineering, March-April 1962
|